top of page

Memorial Hospital West

MRI Replacement
Pembroke Pines, FL

Davila Engineering provided MEPFP engineering services for the replacement of a 1.5T MRI unit and renovation of the MRI Suite. The firm provided the design for electrical and mechanical services to support a temporary MRI trailer for patient service relocation while the facility MRI unit was being constructed. DE provided the electrical and mechanical design for the new permanent MRI unit and update to the equipment modalities room and MRI control room. New critical branch power lighting and systems as well as mechanical engineering to the existing HVAC system were provided to support the project. This project was an AHCA reviewable project.

bottom of page